Registration

 
 
Province
 
State
 
 
 
 
 
Profession
 
 
 
Login
 
Recover password
 

Insulating shell Floor Control Unit, Mixing Unit M3V-F and Mixing Unit M3V-V

Loading...

Notes
 
In closed-cell crosslinked expanded polyethylene.
For installation of the insulating shell, it's necessary to first remove the hydraulic assembly from the box (thus do not make the hydraulic and electrical connections before having installed the insulating shell). If the shell is being installed on an assembly inside a Metalbox metal box, it's recommended that the assembly be installed maintaining a distance of 135 mm between the back of the box and the wall.
 

EMMETI HOME

Discover our systems