Registration

 
 
Province
 
State
 
 
 
 
 
Profession
 
 
 
Login
 
Recover password
 

Insulating shell for Floor Controlbox

Loading...

Notes
 
In closed-cell crosslinked expanded polyethylene.
For installation of the insulating shell, it's necessary to first remove the hydraulic assembly from the box (thus do not make the hydraulic and electrical connections before having installed the insulating shell). Suitable for installation in the Floor Control Unit, Mixing Unit M3V-F and M3V-V, and Firstbox assemblies. Complete with adapter for installation of the flow probe (for climatic temperature control) inside the Floor Control Unit, Mixing Unit M3V-F and M3V-V assemblies.
To be combined with PCOC climatic regulators for heating and cooling.
 

EMMETI HOME

Discover our systems